(2)
The metro railway administration shall give to the owner or occupier of such building at least ten days notice in writing before undertaking the work of underpinning or otherwise strengthening the building:
Provided that where the metro railway administration is satisfied that an emergency exists, no such notice shall be necessary.
(3)
Where the underpinning or strengthening was executed in connection with-
(a) the carrying out of the works upon the land where any building is situated, or
(b) the construction or operation of any metro railway, the metro railway administration may, at any time after the underpinning or strengthening of such building is completed and before the expiration of a period of twelve months,-