(2)
If the contractor fails to provide the canteen within the time laid down the same shall be provided by the principal employer within sixty days of the expiry of the time allowed to the contractor.
(3)
The canteen shall be maintained by the contractor or principal employer, as the case may be, in an efficient manner.